Audit – Martin Linge

On 25 April 2013, the Petroleum Safety Authority Norway (PSA) conducted an audit of the control room solution selected by Total E&PNorge AS (Total) for Martin Linge.


The objective of the audit was to follow up how Total safeguards regulatory requirements for design and development of the control room solution with associated work processes, including use of integrated operations.

The audit was carried out in cooperation with the Norwegian Labour Inspection Authority since they have the regulatory authority for working environment conditions in the onshore control room.

The audit was conducted as an all-day meeting in which Total gave presentations in accordance with the topics listed in the notification letter.
 

Letter to Total (In Norwegian)
Audit report – Martin Linge (In Norwegian)

Journal 2012/220
 