Audit of Aker BP – Ula

On 7 and 8 November 2017 we carried out an audit of Aker BP and the main load-bearing structures at Ula Q, Ula P and Ula D.


Objective
The objective of the audit was to examine how Aker BP is maintaining the integrity of the main load-bearing structures of the operational facilities. The audit was conducted by examining whether the scope of inspections, methods and assessments of results complied with the regulations.

Result
No non-conformities were identified.
 
Three improvement points were identified in connection with:
  • Measures in respect of waves on deck
  • Increasing maintenance backlog
  • Inspection of jacket legs
Aker BP has been given a deadline of 5 February 2018 to report on how the improvement points will be addressed. 