Gå til hovedinnhold

Audit of barrier management, technical safety and electrical installations at Valemon

From 26 October to 5 November 2015, the PSA carried out an audit of barrier management, technical safety and electrical installations on the Valemon facility.


The objective of the audit was to assess how Statoil is ensuring compliance with statutory requirements, recognised standards, and its own requirements within technical safety and electrical installations for the operation and maintenance of Valemon.

Result
Four non-conformities were identified in connection with:

  • Electrical installations
  • Heating cables
  • Fire areas
  • Fire divisions

In addition, six improvement points were identified in connection with:

  • Explosion overpressure
  • Ignition source control
  • Isolation plan
  • Passive fire protection
  • Documentation
  • Fire water supply

Statoil has been given a deadline of 1 February 2016 to report on how the non-conformities and improvement points will be dealt with. 

Eileen Brundtland, Press contact
Email: eileen.brundtland@ptil.no | +47 51 87 35 12