Gå til hovedinnhold

Audit of BP Norge AS – Skarv FPSO

On 29 April 2014, the Petroleum Safety Authority Norway carried out an audit of BP Norge AS (BP)'s management of loading operations from Skarv FPSO to shuttle tankers.


Objective
The objective of the audit was to verify the operator's organisation and division of responsibilities for the loading system, loading operations and shuttle tankers, and applicable governing documents, as well as the risk assessments used as a basis for the system design, maintenance management system, follow-up of shuttle tankers and experience transfer.

Result
No non-conformities were identified.

Two improvement points were identified in connection with:

  • Risk in the loading system and classification
  • Maintenance management

 

Journal 2014/326

 

Inger Anda, Director for communication and public affairs
Email: inger.anda@ptil.no | +47 970 54 064