Audit of Det norske oljeselskap ASA– Ivar Aasen

From 23 to 25 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Det norske's follow-up of the Ivar Aasen project.


Objective
The objective was to verify that engineering of the load-bearing structures was in compliance with applicable regulations.

Result
No non-conformities were identified.

Improvement points were identified in connection with:
• Redundancy controls
• Documentation
• Non-conformity handling
• Fatigue classification of jacket elements


Journal 2014/11


 

 

Inger Anda, Director for communication and public affairs