Audit of environmental data collection at Gullfaks C

From 5 to 7 February 2018, we carried out an audit, in collaboration with the Norwegian Meteorological Institute, of environmental data collection at Gullfaks C.

The objective of the audit was to review relevant routines for performing, maintaining and reporting the collection of environmental data at Gullfaks C and to assess the technical standard of systems and equipment.

No non-conformities were identified.

Two improvement points were identified in connection with:

  • Training
  • Measurement of sea temperatures

Statoil Petroleum AS has been given a deadline of 23 March 2018 to report on how the improvement points will be addressed. 