Audit of follow-up of incident at Slagentangen

On 9 March 2016, the PSA carried out an audit of follow-up of an incident at Slagentangen on 29 January 2016.


The objective of the audit was to evaluate how Esso Norge AS performs investigations of incidents and how these incidents are subsequently followed up with a view to learning, as well as to provide us with a picture of how scaffolding is handled at the facility.

Result
A non-conformity was identified in connection with supervision of scaffolding in the facility

In addition, improvement points were identified in connection with:

  • Investigation of incidents
  • Maintenance of lifting facilities and lifting gear
  • Critical lifts

Non-conformity:
Entails that a condition is assessed as not complying with a regulatory requirement.

Improvement point:
Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.

Øyvind Midttun, Press contact
Email: oyvind.midttun@ptil.no | +47 51 87 34 77