Audit of GDF SUEZ E&P Norge AS – Gjøa facility

From 5 to 8 May 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of GDF SUEZ E&P Norge AS (GDF) on board the Gjøa facility.


Objective
The objective of the audit was to monitor GDF's work in complying with its own and the authorities' requirements for barrier management and follow-up on Gjøa.

Result
One non-conformity was identified in connection with the fire water system.

In addition, improvement points were identified in connection with:
• Governing documents
• Risk analysis
• Ignition source control
• Fire resistance of deck grating