Audit of risk management, technical safety and safety instrumented systems on Skarv FPSO

From 1 to 15 September 2015, the Petroleum Safety Authority Norway carried out an audit of the Skarv FPSO production vessel.


The objective of the audit was to assess how BP is ensuring compliance with regulatory requirements, recognised standards and its own requirements within risk management, technical safety and safety instrumented systems.

Result
Non-conformities were identified in connection with:

  • Risk analyses and risk management
  • Performance requirements
  • Documentation
  • Fire water in the event of gas detection
  • Man-machine interfaces

In addition, improvement points were identified in connection with

  • Continuous improvement
  • Risk matrixes
  • Maintenance management
  • Control room manning
  • Risk reduction

BP has been given a deadline of 15 december 2015 to report on how the non-conformities and improvement points will be dealt with. 

 