Audit of Statoil – Gina Krog

From 15 to 17 December 2014, the Petroleum Safety Authority Norway carried out an audit of the jacket fabrication for Gina Krog.


The objective of the audit was to verify that Statoil's follow-up of fabrication of the jacket was being carried out in compliance with applicable regulations.

Result
No non-conformities were identified.

Improvement points were identified in connection with:

  • Post-weld heat treatment (PWHT)
  • Design life
  • Documentation


Non-conformity:
Entails that a condition is assessed as not complying with a regulatory requirement.

Improvement point:
Entails that we have identified a deficiency, without there being sufficient grounds for determining a breach of regulatory requirements.

 

Inger Anda, Director for communication and public affairs
Email: inger.anda@ptil.no | +47 970 54 064