On 23 and 24 April 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Total E&P Norge AS and the modification project for Martin Linge FSO.


Objective
The objective of the audit was to monitor that Total, in partnership with the owner KNOT FSO 1 AS and engineering contractors, was complying with the barrier management requirements in applicable regulations and standards.

Result
No non-conformities were identified.

Improvement points were identified in connection with:

  • Risk analysis (QRA)
  • Design
  • Performance requirements
  • Fire divisions
     