Gå til hovedinnhold

Audit of ENI Norge – Goliat FPSO

From 18 December 2013 to 23 January 2014, the Petroleum Safety Authority Norway carried out an audit of materials handling on the Goliat FPSO.


Objective
The objective of the audit was to verify the company's management of technical, operational and administrative aspects of materials handling on the Goliath FPSO, and measure this against the company's own and the authorities' requirements.

Result
Non-conformities were identified in connection with:

• personnel and goods lifts
• cargo carrying units and loads

In addition, improvement points were identified in connection with:

• load stops and protective structures
• positioning of spotlights
• MOB boat garage
• procedures for safe lifting operations
• lifting equipment
 

Journal 2013/1454

 

Inger Anda, Director for communication and public affairs
Email: inger.anda@ptil.no | +47 970 54 064