Gå til hovedinnhold

Consent for use of Stena Don on the Fram field

The PSA has given Statoil consent to use the Stena Don mobile drilling facility for drilling and completion of wells 35/11-B-22 and B-13.


Stena Don is operated by Stena Drilling, and is a Sonat/Hitachi-designed, semi-submersible drilling facility, built in 2001. The facility received Acknowledgement of Compliance (AoC) in March 2002.

Fram is an oil field in the northern North Sea around 20 kilometres north of Troll. Water depth in the area is around 350 metres.

The Petroleum Safety Authority Norway has now granted consent to use Stena Don on the Fram field in accordance with Statoil's application.

Eileen Brundtland, Press contact
Email: eileen.brundtland@ptil.no | +47 51 87 35 12