Gå til hovedinnhold

Consent to carry out exploration drilling with Polar Pioneer – well 6507/3-9

BP Norge AS (BP) has received consent to use the mobile Polar Pioneer drilling facility to drill exploration well 6507/3-9 in the Norwegian Sea.


Well 6507/3-9 is part of production licence 212 E. The objective of the drilling is to investigate a prospect BP named “Snadd Outer”.

The facility’s planned position is:

  • 65° 56' 49.900" North
  • 07° 41' 40.459" East

Water depth at the site is 364 metres.

The activity has a planned duration of up to 60 days, starting up in the first half of 2012.

Polar Pioneer (pictured) is operated by Transocean Offshore and is a semi-submersible drilling facility built at Hitachi Zosen, Ariake, Japan.

The facility received the PSA’s Acknowledgement of Compliance in May 2004.

 

Øyvind Midttun, Press contact
Email: oyvind.midttun@ptil.no | +47 51 87 34 77