Gå til hovedinnhold

Consent to use Island Constructor on the Draugen field

The PSA has given AS Norske Shell consent to use the Island Constructor mobile drilling facility for start-up and repair of wells on the Draugen field.


Draugen is an oil field in the Norwegian Sea in 250 metres of water. The field has been developed using a fixed concrete facility with an integrated deck. Stabilised oil is stored in tanks in the base of the facility.

Island Constructor is a facility designed for well intervention which is operated by Island Offshore Management AS. The facility received Acknowledgement of Compliance (AoC) in September 2010.

Øyvind Midttun, Press contact
Email: oyvind.midttun@ptil.no | +47 51 87 34 77