Audit of engineering on Eldfisk

On 10 and 11 May 2012, the Petroleum Safety Authority Norway (PSA) carried out an audit of the engineering of load-bearing structures on Eldfisk 2/7-S’ steel jacket.


The objective of the audit activity was to verify that the engineering of load-bearing structures was in compliance with applicable regulations.

Results
No nonconformities were identified.

Improvement items were identified in relation to:

  • Person technically responsible for structure analyses
  • Verification of engineering
  • Vibration of structural elements
  • Accuracy of wind loads
  • Risk analyses
  • Attenuation of jacket structures
  • Tension concentration analyses
  • Fabrication, installation and operation documentation

Letter to ConocoPhillips Skandinavia AS (In Norwegian)
Audit report - Eldfisk 2/7S (In Norwegian)