Gå til hovedinnhold

Consent to conduct exploration drilling in block 7/12

Det norske oljeselskap ASA has been granted consent to drill exploration well 7/12-13 in production licence 450 with the mobile drilling facility Mærsk Guardian.


The main purpose of the drilling is to explore the hydrocarbon potential in the prospect, which is located between the fields Ula and Tambar in the North Sea and approx. 240 km south-west of Egersund. The geographical coordinates are

• 57° 01' 20.462" N
• 02° 51' 24.401" E

The water depth at the site is 70 metres.

The plan is to start drilling in January 2012 with an estimated duration of 90 days. If discoveries are made, it may become relevant to drill a sidetrack, which will take another 34 days.
 


 

Mærsk Guardian (pictured) is a jack-up drilling facility of the Hitachi 300-IC type, built at the Hitachi shipyard in Japan in 1986. The facility is owned and operated by Mærsk Drilling and received an Acknowledgment of Compliance (AoC) in November 2002.